On site, on time,
on the truck.
We package every order with a method statement, hardware kit, and a phone number that gets answered. No mystery deliveries.
Site survey support
We come to site for openings over $40k. For smaller orders we provide a checklist and review your dimensions before fabrication.
Predictable delivery
You get a fixed two-day delivery window once shop drawings are signed. We pay penalty if we miss it — written into the quote.
Install method statements
Step-by-step installation guide, weatherseal interface details, hardware fitting cards, plus video calls during install if needed.
Trade pricing
Volume discount on multi-unit projects. Net-30 terms after first job. Direct line to fabrication for variations on site.

Pack for the spec set.
- 01 Installation method statement →
- 02 Site survey checklist →
- 03 Hardware fitting guide →
- 04 Weatherseal & flashing details →
- 05 Care & maintenance — owners →
"Six steel openings, packed and labelled by elevation, install crew had nothing to figure out. We don’t get that often."— Tom Reilly, Reilly Construction
From the first email
to the last weld.
Enquire
Send drawings, a schedule and your performance brief. We assess the project and respond with feasibility, typically within five working days. [CONFIRM]
Quote
Itemised by elevation: suite, colour, glazing and hardware resolved. You see exactly what each opening costs.
Approve shop drawings
We work through your plans, with up to one Auckland site measure where needed. Shop drawings issued for sign-off — up to three revision sets included. Nothing is cut until you approve.
Deposit
A 50% deposit confirms your place in the fabrication schedule.
Fabricate
Cut, welded, grit-blasted and finished in your chosen colour, with the full four-stage coating. Joinery pre-drilled for hardware. Progress updates throughout. Progress payment at 30%.
Deliver
Delivered to site unglazed, to avoid transit damage. Auckland delivery included. 10% before the units leave for site.
Install
Installed by our crew to prepared openings, or supplied with a method statement and CAD details for your builder. Hardware fitted on site.
Sign-off
Glazed on site once installed, leaving a clean, finished, weather-tight opening. A final 10% on completion.