The frames
you fell in love with.
You’ve seen them on Instagram or in friends’ houses. Steel windows are an investment — here’s the honest path from "I want them" to "they’re in".
Find an architect
Steel windows want a designed home. We’ll match you with three architects in your region whose work suits — no fee, no obligation.
Showroom, by appointment
Touch the finishes, feel the hardware, slide a door. By appointment, weekdays. Coffee on us.
Honest budget
Steel windows cost roughly 2.5–3× aluminium. We’ll tell you in our first call whether it’s the right tool for your project.
Care, warranty, longevity
15-year frame warranty. Wash with soapy water once a year. Re-coat every twenty. Designed to be your last set of windows.

Pack for the spec set.
- 01 Range overview brochure →
- 02 Find an architect →
- 03 Showroom — by appointment →
- 04 15-year warranty terms →
"They told us, in our first call, our budget would not stretch. Then helped us scope a smaller package that did. Wholly unusual."— Sarah & Ben, Glendhu Bay homeowners
From the first email
to the last weld.
Enquire
Send drawings, a schedule and your performance brief. We assess the project and respond with feasibility, typically within five working days. [CONFIRM]
Quote
Itemised by elevation: suite, colour, glazing and hardware resolved. You see exactly what each opening costs.
Approve shop drawings
We work through your plans, with up to one Auckland site measure where needed. Shop drawings issued for sign-off — up to three revision sets included. Nothing is cut until you approve.
Deposit
A 50% deposit confirms your place in the fabrication schedule.
Fabricate
Cut, welded, grit-blasted and finished in your chosen colour, with the full four-stage coating. Joinery pre-drilled for hardware. Progress updates throughout. Progress payment at 30%.
Deliver
Delivered to site unglazed, to avoid transit damage. Auckland delivery included. 10% before the units leave for site.
Install
Installed by our crew to prepared openings, or supplied with a method statement and CAD details for your builder. Hardware fitted on site.
Sign-off
Glazed on site once installed, leaving a clean, finished, weather-tight opening. A final 10% on completion.