C / For homeowners

The frames
you fell in love with.

You’ve seen them on Instagram or in friends’ houses. Steel windows are an investment — here’s the honest path from "I want them" to "they’re in".

01

Find an architect

Steel windows want a designed home. Tell us your region and we’ll point you at architects whose work suits — no fee, no obligation.

02

Showroom, by appointment

Touch the finishes, feel the hardware, slide a door. By appointment, weekdays. Coffee on us.

03

Honest budget

Steel costs meaningfully more than aluminium. We’ll tell you in our first call whether it’s the right tool for your project — and say so if it isn’t.

04

Care, warranty, longevity

Wash with soapy water once a year; re-coat when the finish asks for it. Designed to be your last set of windows — warranty terms are set out in your quote.

Pack for the spec set.

Tell us which you need and we’ll send it through — we’d rather hand you the current version than leave a stale file on a page.

From the first email
to the last weld.

01

Enquire

Send drawings, a schedule and your performance brief. We assess the project and respond with feasibility, typically within five working days. [CONFIRM]

02

Quote

Itemised by elevation: suite, colour, glazing and hardware resolved. You see exactly what each opening costs.

03

Approve shop drawings

We work through your plans, with up to one Auckland site measure where needed. Shop drawings issued for sign-off — up to three revision sets included. Nothing is cut until you approve.

04

Deposit

A 50% deposit confirms your place in the fabrication schedule.

05

Fabricate

Cut, welded, grit-blasted and finished in your chosen colour, with the full four-stage coating. Joinery pre-drilled for hardware. Progress updates throughout. Progress payment at 30%.

06

Deliver

Delivered to site unglazed, to avoid transit damage. Auckland delivery included. 10% before the units leave for site.

07

Install

Installed by our crew to prepared openings, or supplied with a method statement and CAD details for your builder. Hardware fitted on site.

08

Sign-off

Glazed on site once installed, leaving a clean, finished, weather-tight opening. A final 10% on completion.

Next step

Book a showroom visit, or chat with the studio.