Volume
without the compromise.
Multi-residential, hospitality, mixed-use. We programme around your build sequence and price by elevation, not by guess.
Project pricing
A bound-and-numbered pricing schedule by elevation type. Standardised sections kept in stock for repeat orders.
Programme commitments
Once shop drawings are signed, your delivery window is locked. We hold your slot — and the steel — eight weeks ahead.
Capability statement
Largest project to date: 84 openings, six elevations, twelve months. Currently delivering 200+ unit MUDH in Auckland for a Tier 1.
Procurement docs
Standard NDA, supply terms, performance bonds, sustainability declaration, and a real H&S record. We’re an audit-ready supplier.

Pack for the spec set.
- 01 Capability statement →
- 02 Project pricing schedule →
- 03 Programme & delivery commitments →
- 04 Past project case studies →
"Five buildings, three years, no missed delivery slots. They’re a small team punching like a Tier 1 supplier on programme."— Daniel Akerstrom, Riverstone Property
From the first email
to the last weld.
Enquire
Send drawings, a schedule and your performance brief. We assess the project and respond with feasibility, typically within five working days. [CONFIRM]
Quote
Itemised by elevation: suite, colour, glazing and hardware resolved. You see exactly what each opening costs.
Approve shop drawings
We work through your plans, with up to one Auckland site measure where needed. Shop drawings issued for sign-off — up to three revision sets included. Nothing is cut until you approve.
Deposit
A 50% deposit confirms your place in the fabrication schedule.
Fabricate
Cut, welded, grit-blasted and finished in your chosen colour, with the full four-stage coating. Joinery pre-drilled for hardware. Progress updates throughout. Progress payment at 30%.
Deliver
Delivered to site unglazed, to avoid transit damage. Auckland delivery included. 10% before the units leave for site.
Install
Installed by our crew to prepared openings, or supplied with a method statement and CAD details for your builder. Hardware fitted on site.
Sign-off
Glazed on site once installed, leaving a clean, finished, weather-tight opening. A final 10% on completion.