D / For developers

Volume
without the compromise.

Multi-residential, hospitality, mixed-use. We programme around your build sequence and price by elevation, not by guess.

01

Project pricing

A bound-and-numbered pricing schedule by elevation type. Standardised sections kept in stock for repeat orders.

02

Programme commitments

Once shop drawings are signed, your delivery window is locked. We hold your slot — and the steel — eight weeks ahead.

03

Capability statement

Largest project to date: 84 openings, six elevations, twelve months. Currently delivering 200+ unit MUDH in Auckland for a Tier 1.

04

Procurement docs

Standard NDA, supply terms, performance bonds, sustainability declaration, and a real H&S record. We’re an audit-ready supplier.

Pack for the spec set.

  • 01 Capability statement
  • 02 Project pricing schedule
  • 03 Programme & delivery commitments
  • 04 Past project case studies
"Five buildings, three years, no missed delivery slots. They’re a small team punching like a Tier 1 supplier on programme."
— Daniel Akerstrom, Riverstone Property

From the first email
to the last weld.

01

Enquire

Send drawings, a schedule and your performance brief. We assess the project and respond with feasibility, typically within five working days. [CONFIRM]

02

Quote

Itemised by elevation: suite, colour, glazing and hardware resolved. You see exactly what each opening costs.

03

Approve shop drawings

We work through your plans, with up to one Auckland site measure where needed. Shop drawings issued for sign-off — up to three revision sets included. Nothing is cut until you approve.

04

Deposit

A 50% deposit confirms your place in the fabrication schedule.

05

Fabricate

Cut, welded, grit-blasted and finished in your chosen colour, with the full four-stage coating. Joinery pre-drilled for hardware. Progress updates throughout. Progress payment at 30%.

06

Deliver

Delivered to site unglazed, to avoid transit damage. Auckland delivery included. 10% before the units leave for site.

07

Install

Installed by our crew to prepared openings, or supplied with a method statement and CAD details for your builder. Hardware fitted on site.

08

Sign-off

Glazed on site once installed, leaving a clean, finished, weather-tight opening. A final 10% on completion.

Next step

Brief us — capability statement and project pricing within ten days.